<img height="1" width="1" alt="facebook" style="display:none" src="https://www.facebook.com/tr?id=314229042108894&amp;ev=PixelInitialized">

Our Blog

Q&A: INDOT's SWQCP with Michele Meyer

Posted by Mary Atkins on Tuesday, January 17, 2017 @ 10:00 AM

Wessler interviewed Michele Meyer with the Indiana Department of Transportation (INDOT) about Storm Water Quality Control Plans (SWQCPs), which are required for contractors to prepare and implement for INDOT construction projects.  The requirement became effective in 2016.  Thank you to Michele for taking time to answer our questions.

Read More

Tags: regulations, stormwater, SWQCP

Subscribe

Recent Posts

Posts by Topic

All Topics