Posted By Bridget Philpott on May 13, 2020
If you missed our most recent webinar, “Cost Savings at the WWTP," be sure to watch the recording below!
In this webinar, Project Engineer Bridget Philpott explores how a utility’s power bill is calculated and the operational changes possible at a treatment plant to reduce the bill.
Because this is a recording, this session is not eligible for PDH or CEU credits. If you have questions pertaining to the information in the webinar, please contact Bridget at BridgetP@wesslerengineering.com or 317-788-4551.
Tags