If you missed our most recent webinar, “Cost Savings at the WWTP," be sure to watch the recording below!
In this webinar, Project Engineer Bridget Philpott explores how a utility’s power bill is calculated and the operational changes possible at a treatment plant to reduce the bill.
Because this is a recording, this session is not eligible for PDH or CEU credits. If you have questions pertaining to the information in the webinar, please contact Bridget at BridgetP@wesslerengineering.com or 317-788-4551.